started · updated
Pontevedra plans infrastructure works to prevent Valdecorvos river flooding
The Pontevedra City Council and the Xunta de Galicia have announced plans to address recurring flooding caused by the Valdecorvos river. Recent heavy rains led to significant flooding in garages and commercial premises on streets such as Fernando Olmedo, Casimiro Gómez, and Martín Gaite, particularly near the Centro Galego de Tecnificación Deportiva (CGTD).
The local government intends to tender a project for a 500-meter collector along José Malvar street. This infrastructure, with an internal diameter of approximately 1,200 millimeters, is designed to act as a relief system, diverting excess water directly to the Pontevedra estuary during intense rainfall. The project is expected to be tendered by the end of the year, with construction slated to begin in summer 2027 and conclude by the following winter, involving a budget of approximately two million euros.
Complementing the municipal efforts, the Xunta has committed 4.4 million euros toward creating a controlled flooding zone in Valdecorvos Park and improving river sections in Casimiro Gómez and Fernando Olmedo. While these regional interventions are planned, specific start dates have not been confirmed. Local residents, represented by the association Afirval, have expressed an urgent need for these works, noting that the area has experienced ten floods within the last twelve months.
Entities
Afirval · César Mosquera · Pontevedra City Council · Valdecorvos river · Xunta de Galicia