API
< Back to all clusters
[BUSINESS] · Vietnam · 17 sources

started · updated

Can Tho 2 Bridge project approved with 27,050 billion VND investment

The Ministry of Construction has approved the investment policy for the Can Tho 2 Bridge and its connecting roads. The project has a preliminary total investment of over 27,050 billion VND, funded entirely by the central budget.

Designed as a dual-purpose structure, the bridge will combine a high-speed highway on the upper level with a railway on the lower level. The highway portion will feature six lanes with a design speed of 100 km/h, while the railway will accommodate double tracks for both passenger and freight trains.

The bridge will span the Hau River, located approximately 4.5 km downstream from the existing Can Tho Bridge. The total route length is approximately 17.6 km, connecting the My Thuan-Can Tho expressway in Vinh Long province to the Can Tho-Hau Giang expressway in Can Tho city. Construction is expected to commence in 2027, with a projected completion timeline of five years.

Entities

Can Tho · Can Tho 2 Bridge · Can Tho 2 Bridge Project · Dong Ha · Hai Lang · Hanoi · Hau River · Ministry of Construction · Phan Thiet Airport · Phan Thiet Airport · Quang Tri · Quang Tri Province People's Committee

Claims

What the coverage asserts, and how many sources carry each claim.

  • [○ 1 SOURCE] The Can Tho 2 Bridge project has a preliminary investment of over 27,050 billion VND. www.vietnamplus.vn
  • [○ 1 SOURCE] The road connecting Thanh Hoa city to Tho Xuan Airport has achieved 99.9% land handover. baothanhhoa.vn
  • [● 2 SOURCES] Quang Tri province approved a 12.8 billion VND project to apply AI and robotics to public services. dientuungdung.vn · congnghe.vn
  • [○ 1 SOURCE] Quang Ninh issued a directive to prepare for water shortages caused by El Niño. moitruong.net.vn
  • [● 3 SOURCES] Sun Group is investing 3,900 billion VND in the Phan Thiet Airport project. kenh14.vn · thanhnien.vn
  • [● 3 SOURCES] The Phan Thiet Airport passenger terminal has completed 100% of piling work. kenh14.vn · thanhnien.vn
  • [○ 1 SOURCE] The Can Tho 2 Bridge will combine a highway and a railway. www.vietnamplus.vn
  • [○ 1 SOURCE] Hanoi approved a 13,367 billion VND project for the Ring Road 3.5. baoxaydung.vn
  • [○ 1 SOURCE] Quang Tri is investing 200 billion VND to repair 10 high-risk reservoirs and dams. nhandan.vn
  • [○ 1 SOURCE] The bridge is expected to start construction in 2027. www.vietnamplus.vn
  • [○ 1 SOURCE] The total route length is approximately 17.6 km. www.vietnamplus.vn
  • [○ 1 SOURCE] The bridge will be located approximately 4.5 km downstream from the existing Can Tho Bridge. www.vietnamplus.vn

Sources