started · updated
Red Eléctrica reports voltage control issues in Spain
Red Eléctrica has issued its first report regarding voltage control needs following a blackout on April 28, 2025. The company, led by Beatriz Corredor, identified hundreds of connection points between its transport network and the distribution networks of companies including Iberdrola, Endesa, Naturgy, and EDP.
The report, requested by the National Commission on Markets and Competition (CNMC), highlights that these distributors are injecting reactive energy at points where the system needs to absorb it. This behavior forces Red Eléctrica to intervene to compensate for flows and maintain voltage within safe margins. The company identified 308 specific points where energy is being injected contrary to system requirements.
Reactive power is essential for the operation of electrical equipment and directly influences voltage levels. While injection can raise voltage, absorption helps reduce it. The CNMC has mandated that Red Eléctrica provide quarterly updates to monitor these system needs and reinforce the grid.
Entities
Beatriz Corredor · Endesa · Iberdrola · Naturgy · Red Eléctrica