started · updated
Rome Mayor issues urgent order over ground instability near Tangenziale Est
Rome Mayor Roberto Gualtieri has signed an urgent ordinance following severe ground instability near the Tangenziale Est, specifically at via Cassia 35. The situation is described as having “exceptional gravity” with an imminent danger to people and property.
Technical analyses indicate a risk that the collapse of a 5 to 6 meter high sewage manhole or a retaining wall could directly affect the Tangenziale Est. The instability, which began in December 2025, has worsened, leading to the collapse of part of the Tangenziale Est retaining wall and a private roadbed. Additionally, a gas pipe has been left suspended in the air due to the ground movement.
To mitigate the risk, the Mayor has ordered Acea Ato 2 to intervene immediately on the damaged private sewage network, as continuous water leaks are aggravating the subsidence. The right lane of the Tangenziale Est, between Corso di Francia and the Giovanni XXIII Gallery toward the Stadio Olimpico, has already been closed to traffic by order of the Fire Department.
Entities
Acea ATO 2 · Fire Department · Roberto Gualtieri · Rome · Tangenziale Est