API
< Back to all clusters
[BUSINESS] · South Korea · 2 sources

started · updated

Samsung and SK Hynix water demand gap revealed for Honam semiconductor cluster

New data from the Jeonnam Gwangju Integrated Special City Council reveals a significant disparity in water requirements between Samsung Electronics and SK Hynix for the planned Honam semiconductor cluster. By 2033, when both companies are expected to have two fabs operational, SK Hynix is projected to require approximately 372,000 tons of water per day, which is 1.6 times the 231,000 tons required by Samsung Electronics.

While electricity demands for both companies are expected to be similar by 2033, with Samsung at 3.3GW and SK Hynix at 3.0GW, the water usage gap is attributed to differences in manufacturing processes. Specifically, the ratio of wet cleaning, which uses ultrapure water, versus dry cleaning affects the total volume.

To support these industrial needs, the government and local authorities plan to prepare 6.3GW of power and increase water supplies to 650,000 tons per day by 2030. In conjunction with industrial development, Jeonnam Gwangju is also inspecting 20 redevelopment and reconstruction sites in the Gwangju area to improve residential environments and housing supply for the upcoming semiconductor cluster.

Entities

Honam Semiconductor Cluster · Jeonnam Gwangju Integrated Special City · SK Hynix · Samsung Electronics