started · updated
TESSA Energy launches new cogeneration plant in Skopje
TESSA Energy has officially commissioned a new cogeneration plant at the former Skopje North heating plant in North Macedonia. The initial phase of the project represents a 2.5 million euro investment and features two high-efficiency gas engines. The facility produces 2.1 MW of electrical energy and 2.6 MW of thermal energy, achieving an overall energy utilization rate of up to 90%.
The plant is designed to improve energy security and reduce air pollution in the Skopje municipalities of Chair and Butel. Residual heat from electricity production is transferred to the Energy Ecolink system to provide hot water for approximately 500 households and 14 institutions.
This project marks the first stage of a larger investment cycle. TESSA Group management announced plans for a second phase involving a 10 million euro investment to construct a new cogeneration plant with an installed capacity of 10.5 MW, aiming to create a modern, large-scale energy center.
Entities
Ajri Shej · Aleksandar Nikoloski · Hristijan Mickoski · Sanja Bozhinovska · Sanjа Božinovska · Skopje · Skopje North Heating Plant · Skopje Sever · Tessa Energy
Claims
What the coverage asserts, and how many sources carry each claim.
- [● 2 SOURCES] New energy capacities strengthen state security and stability. utro.mk · vecer.mk
- [○ 1 SOURCE] The new cogeneration plant has an installed capacity of 2.106 MW. vecer.mk
- [● 2 SOURCES] Domestic production increases system resilience against volatile European and global energy market prices. utro.mk · vecer.mk
- [● 2 SOURCES] Tessa Energy has commissioned a new cogeneration plant in the Chair Municipality. utro.mk · vecer.mk