started · updated
Tungsten Mining reports thicker mineralisation at Mt Mulgine
Tungsten Mining has reported significant mineralisation at its Mt Mulgine project in Western Australia, with drill results showing tungsten intersections up to 45m thicker than previously predicted. Initial results from 16 reverse circulation drill holes at the Mulgine Trench deposit included a standout intersection of 292m at 0.11 per cent tungsten trioxide (WO3).
The findings are part of a 140-hole, 40,000m resource expansion drilling program. Chairman Gary Lyons stated that the results reinforce the potential to expand the company’s existing tungsten inventory. The Mt Mulgine project currently holds a mineral resource estimate of 247 million tonnes at 0.11 per cent WO3, with the expansion program targeting an additional 165–200Mt.