< Back to all clusters
[BUSINESS] · United States · 4 sources

started · updated

U.S. Army awards $2.2B for nuclear microreactors

The U.S. Army has launched the Janus Program, awarding up to $2.2 billion to private and public vendors to build, own, and operate nuclear microreactors at five domestic military installations. The program aims to enhance energy resilience and power projection by providing reliable, localized baseload power, reducing reliance on vulnerable external grids and fossil fuel supply chains.

The Army expects more than 20 microreactors to be deployed across installations. The five selected vendors and their respective locations are:

• Antares Nuclear, Inc.: Fort Bragg, North Carolina • BWXT Advanced Technologies, LLC: Fort Campbell, Kentucky • General Atomics Electromagnetic Systems: Fort Hood, Texas • Radiant Industries, Inc.: Fort Benning, Georgia • Westinghouse Government Services: Fort Drum, New York

In partnership with the Defense Innovation Unit (DIU), the program utilizes a vendor-owned operating model. For example, BWXT Technologies is slated to deploy a 20-megawatt reactor at Fort Campbell, with a projected groundbreaking in late 2028 and operations beginning in the early 2030s. These modular, factory-built reactors are designed to be transportable via standard truck, rail, air, or barge.

Entities

BWX Technologies · Defense Innovation Unit · Radiant Industries · U.S. Army · Westinghouse Government Services

Claims

What the coverage asserts, and how many sources carry each claim.

  • [● 2 SOURCES] General Atomics Electromagnetic Systems will deploy microreactors at Fort Hood, Texas. www.oilandgas360.com
  • [● 3 SOURCES] BWXT Advanced Technologies, LLC will deploy a 20-megawatt reactor at Fort Campbell, Kentucky. www.formosadeportiva.com.ar · www.oilandgas360.com
  • [● 2 SOURCES] The Army expects more than 20 total nuclear microreactors to be built and operated across installations. www.oilandgas360.com
  • [● 2 SOURCES] The U.S. Army has selected five nuclear energy vendors and five initial locations under the Janus Program. www.oilandgas360.com
  • [○ 1 SOURCE] The Fort Campbell project targets a late 2028 groundbreaking with operations beginning in the early 2030s. www.formosadeportiva.com.ar
  • [● 2 SOURCES] The Army is awarding up to $2.2 billion to own, construct, and operate nuclear microreactors on military installations. www.oilandgas360.com
  • [● 2 SOURCES] Radiant Industries, Inc. will deploy microreactors at Fort Benning, Georgia. www.oilandgas360.com
  • [● 2 SOURCES] Antares Nuclear, Inc. will deploy microreactors at Fort Bragg, North Carolina. www.oilandgas360.com