API
< Back to situation

[REVISION HISTORY]

NASA Artemis lunar exploration program

15 recorded revisions of this situation.

What changed

2026-11-10 05:40 UTC → 2026-11-23 10:03 UTC · added removed

NASA’s Artemis program continues to advance toward its goal of returning humans to the Moon. Following the successful Artemis II mission in April 2026, technical preparations for Artemis III, targeted for 2027, are intensifying. This mission will serve as a critical rehearsal for crewed lunar landings in 2028. NASA has released detailed operational plans for Artemis III, which will utilize three distinct launch vehicles: NASA’s Space Launch System (SLS), Blue Origin’s New Glenn, and SpaceX’s Starship. The sequence involves Blue Origin’s New Glenn launching first to transport the Blue Moon Mark 2 lander into low Earth orbit. Subsequently, the SLS will launch the Orion spacecraft, carrying astronauts Randy Bresnik, Andre Douglas, Frank Rubio, and Luca Parmitano. The crew will perform two distinct docking maneuvers in low Earth orbit to test lunar lander technologies. First, they will dock with the Blue Moon Mark 2 to evaluate life support, pressure, and environmental control systems; during this phase, astronauts will actually enter the vehicle. Following this, the crew will conduct a docking and separation test with SpaceX’s Starship, though they will not enter that vehicle during this approximately two-hour maneuver. The mission, expected to last between 14 and 17 days, will also include evaluations of survival protective suits and various scientific experiments to mitigate risks for future lunar south pole landings. At In November 2026, NASA Administrator Jared Isaacman held discussions at the Kennedy Space Center, crews have begun moving the 212-foot SLS core stage into Center with the Vehicle Assembly Building to complete Artemis II crew regarding the “short stack” configuration by integrating it with solid rocket booster motor segments. The Artemis III crew is also conducting launch day rehearsals mission, the SLS, and emergency exit drills. To support long-term goals, NASA has opened applications moon base development. During a separate conference in Huntsville, Alabama, the crew provided updates on resource allocation for Mars exploration and technical developments. Additionally, ESA astronaut Luca Parmitano, selected as a new generation pilot for the preparatory Artemis III mission, emphasized the experimental importance of astronauts, with final selections expected by late 2027. the 15 days of intensive testing involved in the mission.

Versions

  1. 2026-11-23 10:03 UTC NASA Artemis lunar exploration program
  2. 2026-11-10 05:40 UTC NASA Artemis lunar exploration program
  3. 2026-11-08 22:04 UTC NASA Artemis lunar exploration program
  4. 2026-10-31 12:53 UTC NASA Artemis lunar exploration program
  5. 2026-10-30 09:48 UTC NASA Artemis lunar exploration program
  6. 2026-10-29 07:35 UTC NASA Artemis lunar exploration program
  7. 2026-10-28 17:15 UTC NASA Artemis lunar exploration program
  8. 2026-10-28 03:24 UTC NASA Artemis lunar exploration program
  9. 2026-10-27 11:19 UTC NASA Artemis lunar exploration program
  10. 2026-10-26 16:21 UTC NASA Artemis lunar exploration program
  11. 2026-10-25 05:32 UTC NASA Artemis lunar exploration program
  12. 2026-10-23 21:44 UTC NASA Artemis lunar exploration program
  13. 2026-10-23 04:13 UTC NASA Artemis lunar exploration program
  14. 2026-10-18 10:14 UTC NASA Artemis lunar exploration program
  15. 2026-10-16 19:34 UTC NASA Artemis lunar exploration program
  16. 2026-09-24 04:52 UTC NASA Artemis lunar exploration program

Select a version to see what changed compared to the one before it.