[REVISION HISTORY]
Arauco Sucuriú Project development
Updated 1 time since CLSTR started tracking revisions of this situation.
What changed
2026-10-06 14:08 UTC → 2026-10-10 14:30 UTC ·
added
removed
Arauco is advancing its Sucuriú Project, which involves the construction of a new cellulose factory in Inocência, Mato Grosso do Sul, scheduled for inauguration in 2027. To support local environmental management, the company has invested R$ 1 million in selective waste collection equipment for a future Waste Sorting Unit (UTR). This equipment, which includes a green waste shredder, hydraulic press, and forklift, aims to reduce fire risks and landfill volume. Sul. The US$ 4.6 billion project is currently approximately 81% complete, placing it 6% ahead of its original schedule. The facility is expected to be operational by February 2027. begin operations in the fourth quarter of 2027, with full capacity anticipated during 2028. At the 58th ABTCP International Cellulose and Paper Congress, Arauco highlighted showcased the project’s progress through immersive virtual experiences. The company highlighted technological integration, focusing integration centered on Industry 4.0 and 5.0 concepts. The project’s scope encompasses concepts, spanning forestry advancements, such advancements—such as fire protection silviculture and sustainable management, as well as social the use of biocontrolers—to industrial operations and logistics. Social development initiatives through in the region continue to focus on education and professional training training. Infrastructure development includes a 47-kilometer railway branch connecting the factory to the Ferronorte line, which is expected to be operational by the first half of 2027. To avoid potential delays and an estimated R$ 12.6 million in extra costs for construction firms, Arauco recently withdrew a lawsuit against the region. municipality of Inocência regarding a tax dispute over the Service Tax (ISS) rate. The plant, situated on 3,500 hectares near the Sucuriú River, is designed to produce 3.5 million tons of short-fiber cellulose annually. Arauco has confirmed that the timber supply required for the initial years of operation is already secured. Additionally, the company has invested R$ 1 million in selective waste collection equipment for a future Waste Sorting Unit (UTR) to manage environmental impact.
Versions
- 2026-10-10 14:30 UTC Arauco Sucuriú Project development
- 2026-10-06 14:08 UTC Arauco Sucuriú Project development
Only revisions since CLSTR began indexing content versions appear here. Select a version to see what changed compared to the one before it.