API
< Back to situations

Monitor this situation.

[SITUATION] · [QUIET] · [BUSINESS]

2 clusters · 3 sources · 8 days · First seen · Last updated

Circular Center Netherlands construction project

Overview

The Circular Center Netherlands (CCN) is being developed in Heerde as a knowledge hub for sustainable building. The project serves as a large-scale pilot for the European ReCreate project, aiming to bring together researchers, educators, entrepreneurs, and government organizations.

The eight-story structure is being constructed using recycled prefab concrete elements, including facade elements and channel plates salvaged from the former Prinsenhof A provincial government building in Arnhem. Engineering studies using original production drawings confirmed that these forty-year-old components maintain sufficient load-bearing capacity for the multi-story building. The municipality of Heerde has issued the necessary construction permits for the site located along the A50.

Entities

Circular Center Netherlands · Heerde · Kampen · Lagemaat · ReCreate project

Timeline

  1. [BUSINESS] 2 sources
    Heerde grants permit for Circular Center Netherlands construction

    Heerde has approved the construction of the Circular Center Netherlands, a project using repurposed concrete elements to promote circularity in the Dutch construction sector.

  2. [TECHNOLOGY] 2 sources
    Circular Center Netherlands uses recycled prefab concrete

    The Circular Center Netherlands in Heerde is being built using recycled prefab concrete elements from a former provincial building in Arnhem, marking a major European pilot in circular construction.

Sources

bouwnieuwsvandaag.nl · bruzz.be · pi-online.nl