[REVISION HISTORY]
Ecatepec municipal infrastructure and urban management
8 recorded revisions of this situation.
What changed
2026-11-15 21:52 UTC → 2026-11-19 06:51 UTC ·
added
removed
In late October 2026, Mayor Azucena Cisneros Coss inaugurated the renovation of Benito Juárez street in the El Árbol neighborhood. The 512 meter project addressed over 20 years of disrepair by laying 2,718 square meters of asphalt and installing streetlights, curbs, and drainage systems. Public Works Director Carlos Ramírez Brassetti noted that local residents participated in the construction, which officials stated would directly benefit approximately 1,300 residents. By early November 2026, municipal efforts expanded to urban order and public safety. Following the “Operativo Rastrillo” in the Nicolás Bravo neighborhood to remove illegal structures, the administration conducted the “Moto Segura” operation in the Fuentes de Aragón neighborhood. In response to these This security operation, a joint effort between municipal police and regulatory efforts, the Mayor announced Navy, led the opening of Mayor to announce a new municipal vehicle impound lot that will not charge provide free towing or and storage fees for vehicles impounded to prevent abuses by traffic authorities. private concessionaires. Furthering these initiatives, Mayor Cisneros Coss launched the “Presidenta en tu comunidad” program to collect citizen demands for the 2027 budget. During neighborhood visits, residents identified needs for water, drainage, and security, prompting the Mayor to announce plans for a Cutzamala System derivation and a night trash collection service. In mid-November 2026, the administration expanded its social and urban services. The Mayor Cisneros Coss inaugurated the third Casa del Adolescente in Ciudad Cuauhtémoc, a facility providing free health care, psychological counseling, and cultural activities. psychological services. Additionally, the Mayor inaugurated the “Sendero Seguro” (Safe Path) project was launched on Esmeralda Street in the Piedra Grande neighborhood. This project involved rehabilitating steep terrain, installing 20 lights, removing five tons of waste, Street, and adding 11 community murals. The Mayor noted that the first phase of 300 Safe Paths is nearly complete, with a second phase of 300 more planned for underserved communities. Also in mid-November, the municipal government completed a 55 million peso infrastructure project was completed in the Tulpetlac area, specifically targeting Calle Pinos and Avenida Principal. The project involved repaving 237 linear meters of roadway with hydraulic concrete and rehabilitating water to rehabilitate roadways and drainage networks. Most recently, the Mayor announced a program for ravine sanitation, which includes disconnecting sewage discharges to eliminate infection points.
Versions
- 2026-11-19 06:51 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-15 21:52 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-13 15:41 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-11 19:44 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-10 16:13 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-09 23:58 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-09 00:41 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-08 18:02 UTC Ecatepec municipal infrastructure and urban management
- 2026-11-07 16:15 UTC Ecatepec municipal infrastructure and urban management
Select a version to see what changed compared to the one before it.