[REVISION HISTORY]
Electrical service disruptions in Latin America
2 recorded revisions of this situation.
What changed
2026-11-16 17:46 UTC → 2026-11-17 04:12 UTC ·
added
removed
Multiple regions across Latin America have experienced electrical service disruptions due to maintenance, infrastructure improvements, and generation failures. In late October, outages were reported in Mexico, Puerto Rico, Colombia, Argentina, and Chile. Specific actions included maintenance operations by the CFE in Yucatán and Tijuana, technical failures in Puerto Rican generating plants, and scheduled cuts by Enel Colombia in Bogotá and its surrounding areas. Argentina and Chile also reported planned interruptions for maintenance and technical improvements. By mid-November, scheduled power cuts continued in Argentina, specifically in Laprida for equipment replacement, and across several regions of Paraguay, including the eastern, central, southern, and metropolitan areas. On November 15, utility provider Empresa Provincial de la Energía (EPE) reported ongoing restoration efforts in rural areas of Esperanza, Humboldt, and Cavour following a severe storm on November 13. While urban services were recovered within 18 hours, significant damage to electrical installations in rural sectors was expected to require 48 to 72 hours for full normalization. Civil Defense reported that wind gusts exceeding 50 kilometers per hour caused extensive damage, including the fall Recent reports indicate ongoing disruptions in Argentina, where rising levels of over 50 utility poles along Route 5. The storm, which brought heavy rain the Paraná River in Reconquista have led to evacuations and hail, primarily affected rural preventive power cuts. In Chile, Enel has announced scheduled electricity cuts in various sectors of Routes 5 and 6, impacting areas such as La Flor, San Miguel, San Bernardo, Maipú for technical improvements. In Puerto Rico, LUMA Energy is conducting maintenance and El Barrial. vegetation removal across 17 municipalities, with some outages lasting up to 12 hours. Additionally, Afinia is performing infrastructure optimization in several municipalities in Córdoba, Colombia.
Versions
- 2026-11-17 04:12 UTC Electrical service disruptions in Latin America
- 2026-11-16 17:46 UTC Electrical service disruptions in Latin America
- 2026-11-16 04:04 UTC Electrical service disruptions in Latin America
Select a version to see what changed compared to the one before it.