Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [ACTIVE] · [BUSINESS]
2 clusters · 5 sources · 16 days · First seen · Last updated
Gold Terra Resource Con mine project development
Overview
Gold Terra Resource Corp has outlined plans to begin gold mining operations at the former Con mine as early as 2027, subject to obtaining necessary permits. CEO Gerald Panneton indicated that the project may leverage existing infrastructure, such as roads, a water treatment plant, and two mining shafts, to manage start-up costs. The company has conducted over 130 drill holes to investigate gold concentrations within the tailings.
Subsequent reports confirmed significant high-grade drilling results at the site near Yellowknife. One new drill hole in zone 103N intersected 7.35 meters with an average grade of 6.61 g/t gold, featuring a peak interval of 31.6 g/t gold. The company, which holds an option to fully acquire the site from Newmont, expects to release its first feasibility study in December 2026 with an annual production target of 140,000 ounces of gold.
Entities
Yellowknife · Newmont · Con mine · Gerald Panneton · Con-Mine project
Timeline
-
[BUSINESS] 5 sourcesGold Terra Resource reports high-grade gold drilling results
Gold Terra Resource reported high-grade gold intercepts at its Con-Mine project near Yellowknife, targeting an annual production of 140,000 ounces.
-
[BUSINESS] 2 sourcesGold Terra Resource Corp targets 2027 mining start at Con mine
Gold Terra Resource Corp CEO Gerald Panneton aims to begin mining at the former Con mine in 2027, leveraging existing infrastructure and gold found in tailings.
Sources
finanzen.net · finanznachrichten.de · mittelstandcafe.de · prmitteilung.de · reporterbox.de