< Back to situation

[REVISION HISTORY]

Hung Vuong International Sports Complex development

Updated 4 times since CLSTR started tracking revisions of this situation.

What changed

2026-10-19 09:36 UTC → 2026-10-23 00:27 UTC · added removed

Vingroup is developing the Hung Vuong International Sports Complex within the Vinhomes Global Sportia Hanoi urban area in southern Hanoi. Spanning over 400 hectares, the complex is intended to serve as a global sports, cultural, and entertainment hub. The centerpiece of the development is the VinFast Stadium, formerly known as the Stadium (formerly VinFast - Trong Dong Stadium. The name change honors the automotive brand under the Vingroup umbrella, while the design retains a prominent golden dome inspired by the ‘trong dong’ bronze drum culture. This 73.3-hectare facility is designed Stadium). Designed to accommodate 135,000 spectators, a capacity that would surpass both the facility aims to become the world’s largest stadium by capacity, surpassing India’s Narendra Modi Stadium and North Korea’s Rungrado 1st of May Stadium. Construction, which began in late 2025, is progressing rapidly. The design features a golden dome inspired by ‘trong dong’ bronze drum culture and an automated retractable roof meeting FIFA standards. Construction has accelerated significantly. As of October September 2026, massive pillars nearly 80 meters high have been erected to support the project is drawing international media attention from outlets such as China’s Dongqiudi and South Korea’s Newsis. Work is currently focused on dome. By late September, work was advancing through the simultaneous construction third tier of stands A, B, C, and D, alongside the assembly of 80-meter stands, with specialized steel structures. Due modules being prepared for installation. The roof’s steel structure is expected to this progress, the projected completion weigh approximately 66,000 tons. To meet ambitious deadlines, approximately 20,000 workers are operating across three shifts. The project timeline has been moved up from August 2028 to July 2027. The concrete structure is scheduled for completion by December 2026, with the retractable roof expected to be finished by December 2026. The stadium will feature an automated retractable roof, artificial intelligence, and green technology to meet FIFA standards. May 2027. Other planned facilities include a 40,000-seat athletics stadium, a 12,000-seat indoor arena, an aquatic center, and approximately roughly 300 courts for various sports. sports courts.

Versions

  1. 2026-10-23 00:27 UTC Hung Vuong International Sports Complex development
  2. 2026-10-19 09:36 UTC Hung Vuong International Sports Complex development
  3. 2026-09-30 23:15 UTC Hung Vuong International Sports Complex development
  4. 2026-09-27 10:03 UTC Hung Vuong International Sports Complex development
  5. 2026-09-26 01:33 UTC Hung Vuong International Sports Complex development

Only revisions since CLSTR began indexing content versions appear here. Select a version to see what changed compared to the one before it.