[REVISION HISTORY]
King River Resources Mindoolah gold exploration
1 recorded revision of this situation.
What changed
2026-10-12 03:08 UTC → 2026-11-02 02:35 UTC ·
added
removed
King River Resources has advanced exploration activities at its Mindoolah gold project in the Murchison region of Western Australia. Initial reverse-circulation drilling yielded significant results, including a 79 per cent hit rate across 19 holes. Notable intercepts included 1 metre at 13.59 grams per tonne gold at the Bertram’s prospect and a 3-metre intercept at 4.7 g/t gold at the Le Soleil prospect. Managing director Graham Gadsby highlighted the shallow nature of the mineralisation as a “compelling factor.” Following these results, the company launched its largest drilling campaign to date, an 11,082-metre reverse-circulation program. This phase-two initiative targets eight priority areas, specifically focusing on the Excelsior, Excelsior Repeat, and Demagnetised targets to test for gold extensions. The company is also commencing an aeromagnetic survey. Recent systematic soil sampling has identified significant gold anomalies across the project. A standout result of 231.8 parts per billion gold was recorded at the Golden Gate prospect. In the eastern zone, the mean concentration of elevated samples was 21ppb, which is ten times the normal background concentration. On the western side, the Le Soleil-Demagnetised target corridor showed values up to 69.9ppb gold. These findings are expected to inform the ongoing drilling campaign, which has recently shifted focus to the Demagnetised target.
Versions
- 2026-11-02 02:35 UTC King River Resources Mindoolah gold exploration
- 2026-10-12 03:08 UTC King River Resources Mindoolah gold exploration
Select a version to see what changed compared to the one before it.