API
< Back to situation

[REVISION HISTORY]

NASA lunar base preparation and permanent presence research

12 recorded revisions of this situation.

What changed

2026-11-08 04:18 UTC → 2026-11-08 10:07 UTC · added removed

NASA is advancing its Moon Base Program by investigating lunar pits and underground caves that could serve as natural shelters for future astronauts. Through the Payloads and Research Investigations on the Surface of the Moon (PRISM) program, the agency has selected three scientific investigations to address the challenges of long-term lunar habitation. A primary focus involves the Geophysical Instruments for Marius Lunar Pit Investigation (GIMLI) project, led by habitation, including the Planetary Science Institute (PSI). The mission aims GIMLI project to confirm if investigate the Marius Hills Pit leads Pit, the LEMS-SP for environmental monitoring, and the DISCO project to search for ice deposits. To support a vast network of subterranean lava tubes that could provide critical protection against extreme temperature fluctuations, cosmic radiation, permanent presence, NASA has unveiled a comprehensive plan featuring a new $10 billion contract framework for commercial cargo deliveries under the CLPS 2 initiative. Eight companies, including Blue Origin, SpaceX, and micrometeorite impacts. To investigate Lockheed Martin Space, will be eligible to compete for lunar delivery missions over the site, next decade. Additionally, NASA has increased the GIMLI team will deploy a lander ceiling of its existing CLPS 1.0 contract from $2.6 billion to $4.2 billion, with deliveries potentially continuing until November 2033. A key component of this infrastructure is the development of PROMISE (Polar Rover for Observation, Mapping, and In-Situ Exploration), a remotely operated six-wheeled, nuclear-powered rover through designed to explore the Commercial Lunar Payload Services (CLPS) initiative, utilizing ground-penetrating radar, seismic sensors, gravity measurements, and cameras. Two additional PRISM projects have been selected: Moon’s south pole. Utilizing a multi-mission radioisotope thermoelectric generator, the Lunar Environment Monitoring Station – South Pole (LEMS-SP), which rover will monitor seismic activity, micrometeoroids, and be capable of operating during long lunar dust to assess terrain stability, nights and the DISCO project, which will search for hidden ice deposits in permanently shadowed regions to provide water, oxygen, or fuel. To support a permanent presence, NASA regions. A Blue Origin lander is developing infrastructure including energy, communications, and scheduled to deliver the nuclear-powered PROMISE rover by late 2028. Other upcoming milestones include the CAPSTONE 02 mission for south pole exploration. While lunar navigation testing and SpaceX’s planned 2028 launch of communication satellites to cislunar space. NASA aims to return astronauts to the Moon by 2028, the construction of a with permanent outpost is not construction anticipated to begin until in 2032 or later. The agency has also expanded its CLPS contracts, with the CLPS 2 program potentially valued at up to $10 billion over 10 years.

Versions

  1. 2026-11-08 10:07 UTC NASA lunar base preparation and permanent presence research
  2. 2026-11-08 04:18 UTC NASA lunar base preparation and permanent presence research
  3. 2026-10-23 08:37 UTC NASA lunar base preparation and permanent presence research
  4. 2026-10-23 04:58 UTC NASA lunar base preparation and permanent presence research
  5. 2026-10-11 23:09 UTC NASA lunar base preparation and permanent presence research
  6. 2026-10-11 19:54 UTC NASA lunar base preparation and permanent presence research
  7. 2026-10-11 00:14 UTC NASA lunar base preparation and permanent presence research
  8. 2026-10-10 04:08 UTC NASA lunar base preparation research
  9. 2026-10-09 01:26 UTC NASA lunar base preparation research
  10. 2026-10-08 02:38 UTC NASA lunar base preparation research
  11. 2026-10-07 04:26 UTC NASA lunar base preparation research
  12. 2026-10-06 07:53 UTC NASA lunar base preparation research
  13. 2026-10-04 20:12 UTC NASA lunar base preparation research

Select a version to see what changed compared to the one before it.