< Back to situation

[REVISION HISTORY]

Talgo European high-speed rail development

Updated 1 time since CLSTR started tracking revisions of this situation.

What changed

2026-10-18 09:35 UTC → 2026-10-19 22:10 UTC · added removed

The Talgo company and the Basque Government launched the ‘BasqTrain 35’ project, a 105 million euro initiative to develop high-speed trains compatible with various European technical standards and track gauges. This project, part of the ‘Euskadi 2030’ industrial plan, aims to reduce market fragmentation and increase technological sovereignty in the rail sector. Following this announcement, Talgo indicated it will propose dual-gauge is currently preparing a formal proposal for Comboios de Portugal (CP) to supply high-speed trains for the Lisbon-Porto connection. The tender has a base value of approximately 504 million euro rail tender in Portugal. Although euros. While the current tender for the Lisbon-Porto connection specifies requirements specifically mandate Iberian gauge tracks, compatibility, Talgo is positioning its variable gauge technology as a strategic advantage. CEO Ricardo Chocarro stated noted that their this technology allows trains to adapt to transition between different track widths without stopping, offering providing Portugal a strategic advantage for future with greater flexibility should the country adopt the European standard gauge integration. or seek to operate in different international markets in the future. Talgo faces competition from the French company Alstom for the contract. The proposal must address the specific complexities of the Portuguese network, including the necessity of operating on various line types while high-speed infrastructure remains under construction.

Versions

  1. 2026-10-19 22:10 UTC Talgo European high-speed rail development
  2. 2026-10-18 09:35 UTC Talgo European high-speed rail development

Only revisions since CLSTR began indexing content versions appear here. Select a version to see what changed compared to the one before it.