started · updated
Argentina faces infrastructure hurdles for Vaca Muerta and lithium sectors
Argentina’s major energy and mining projects, specifically the Vaca Muerta hydrocarbon deposit and lithium mining in the Andes, face significant logistical challenges. While Vaca Muerta is recognized as one of the world’s largest unconventional gas and oil deposits, its development relies heavily on hydraulic fracturing (fracking) techniques.
Despite the economic potential, deteriorating national roads, undefined freight rail networks, and fragile border crossings to the Pacific present major obstacles for investors. These infrastructure gaps threaten the goals of the Incentive Regime for Large Investments (RIGI). For instance, Jujuy province aims to double its lithium production from 80,000 to 160,000 annual tons, but this growth is contingent on improved logistics. Similarly, in the Cuyo region, the mountainous terrain of Mendoza and San Juan requires better road and rail connectivity to support the growing export demand for extracted resources.
Entities
Argentina · Jujuy · Mendoza · Vaca Muerta · YPF