started · updated
Belgrade metro tunneling machines arrive at Makiš
Belgrade City Manager Miroslav Čučković announced that the first Tunnel Boring Machine (TBM) for the Belgrade metro project is currently at Makiš, where it will be assembled and prepared for operation. A second machine is expected to arrive at the port of Constanta, Romania, on November 18. Depending on the water levels of the Danube, the second machine is scheduled to reach the Port of Belgrade and be transported to the Pančevo Bridge by the end of the year.
These Chinese-manufactured machines, each measuring 108 meters in length and weighing 1,800 tons, are intended to begin work in 2027 on the first 11-kilometer section of the metro line. This initial segment will run from Žarkovo to Karaburma, forming part of the line connecting Železnika to Mirijevo. One machine will begin excavation from the future Bele Vode station toward the Sajam station, while the other will operate from a launch shaft in Karaburma near the Pančevo Bridge.
Entities
Belgrade · Beogradski voz i metro · Constanța · Makiš · Miroslav Čučković