< Back to all clusters
[POLITICS] · Brazil · 13 sources

started · updated

Várzea Grande sanitation crisis requires up to R$ 3.2 billion in investment

Várzea Grande is addressing a critical sanitation crisis through the update of its Municipal Basic Sanitation Plan (PMSB). During a recent public hearing, residents reported severe water shortages, low pressure, and irregular supply, with some areas experiencing up to 12 days without water.

Technical diagnostics from FIPE reveal a dire situation: water distribution losses reach up to 60%, and sewage coverage is below 29%. Only 53.88% of households are effectively served by the water network. To resolve these historical failures and reach a 90% service universalization goal by 2033, experts and officials estimate that investments ranging from R$ 2 billion to R$ 3.2 billion will be required.

Sérgio Ricardo, president of the Mato Grosso State Court of Accounts (TCE-MT), called for a 'management shock' and national political coordination to secure the necessary funding. Mayor Flávia Moretti emphasized that her administration is committed to tackling these long-neglected issues, aiming to leave a permanent legacy of improved water access for the city's 300,000 inhabitants.

Entities

FIPE · Flávia Moretti · Fundação Instituto de Pesquisas Econômicas · Novo PAC · Plano Municipal de Saneamento Básico · Plano Rio Grande · Sérgio Ricardo · TCE-MT · Tribunal de Contas do Estado de Mato Grosso · Ubá · Vila Estância Nova · Várzea Grande

Claims

What the coverage asserts, and how well corroborated each claim is across sources.

Sources