< Back to all clusters
[TECHNOLOGY] · Türkiye, Greece, Italy, Egypt · 9 sources

Manisa to Turn Waste Sludge into Energy and Soil Amendments

Manisa Su ve Kanalizasyon İdaresi (MASKİ) has signed a contract to launch the EU‑funded “Sludge2Energy” project, the first of its kind in Turkey. The eight‑month agreement, worth about 350,000 EUR (roughly 20 million TRY), will see the sludge from the Manisa Central Wastewater Treatment Plant processed by pyrolysis. The resulting gas will supply the plant’s own power needs, while the solid by‑product will be used as a soil‑improving amendment. The initiative is 100 % grant‑funded by the European Union and involves an eight‑partner consortium that includes Greece, Italy and Egypt.

In parallel, MASKİ’s director Ali Kılıç announced a broader infrastructure programme for the province, comprising 46 projects with a total investment of 3.5 billion TRY. These include the 2 billion TRY Muradiye project, new water reservoirs, upgraded sewage networks and measures to address water‑supply interruptions across 17 districts and over 690 000 subscribers.

Entities: Ali Kılıç · Besim Dutlulu · European Union · Manisa Su ve Kanalizasyon İdaresi (MASKİ) · Onur Artan

Claims

What the coverage asserts, and how well corroborated each claim is across sources.

  • [● 7 SOURCES] The project is funded 100 % by an EU grant. (Multiple articles)
  • [● 2 SOURCES] MASKİ is carrying out 46 infrastructure projects in Manisa worth a total of 3.5 billion TRY. (Multiple articles)
  • [● 7 SOURCES] The sludge will be processed by pyrolysis to produce gas for the plant’s own energy needs and a solid soil‑improving product. (Multiple articles)
  • [○ 1 SOURCE] The Muradiye project, costing about 2 billion TRY, includes a new sewage treatment plant and a 10,000‑ton water reservoir. (Article ca28f8a1-8423-443d-a84f-7e789082cfd0)
  • [● 7 SOURCES] Eight international partners, including Greece, Italy and Egypt, are part of the consortium. (Multiple articles)
  • [● 7 SOURCES] MASKİ signed an eight‑month contract with a contractor for the Sludge2Energy project. (Multiple articles)
  • [● 7 SOURCES] The project budget is about 350,000 EUR, roughly 20 million TRY. (Multiple articles)