started · updated
Hydrological shifts trigger dam openings and water management changes
Multiple regions are managing significant hydrological shifts. In the Paraná River basin, the Yacyretá Binational Entity has opened its main spillway gates to mitigate rising water levels caused by intense rainfall and El Niño. This has led to high water levels in Ituzaingó, Argentina, and Ayolas, Paraguay, prompting the preventive closure of the Ituzaingó-Ayolas international crossing and the suspension of tourism at the Iguazú Falls.
In Honduras, authorities are addressing water security through various means. The government has completed 10 of 20 planned cloud seeding flights to combat drought in the Dry Corridor. In the Central District, the recovery of the Los Laureles reservoir to 100% capacity has allowed officials to reduce water rationing from 12 to 9 days. Additionally, the government is negotiating to settle a $42 million debt with a road concessionaire to regain control of the Canal Seco highway.
In Spain, the Andalusia region reports a significant improvement in water reserves, with reservoirs reaching 69% capacity, a substantial increase compared to the previous year's drought conditions.
Entities
ANDE · Central District Municipality · Coquimbo Region · Darwin Cortés · Distrito Central · Entidad Binacional Yacyretá · Honduras Government · ITAIPU · Iguazú River · Ituzaingó · Juan Diego Zelaya · La Concepción