[ORGANIZATION]
GEN energija
Featured in 1 tracked story · first seen
Situations
Krško Nuclear Plant output cut amid low Sava water
2 clusters · 24 sources · last updated
Latest: Krško nuclear plant cuts output to 80% amid low Sava water levels
The Krško nuclear power plant (NEK) began a planned, controlled reduction to about 80 % of its capacity (≈530 MW) on the night of 6 August 2026 because of exceptionally low water levels and high temperatures in the Sava