Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [ACTIVE] · [BUSINESS]
3 clusters · 47 sources · 5 days · First seen · Last updated
Ayder Plateau road infrastructure development
Overview
Turkey is progressing with the 36.5-kilometer Pazar-Ardeşen Junction–Çamlıhemşin–Ayder Provincial Road project, an infrastructure development designed to improve access to the Ayder Plateau.
On August 17, Minister of Transport and Infrastructure Abdulkadir Uraloğlu inaugurated a new 2-kilometer section of the project. This segment includes the 955-meter Çamlıhemşin Tunnel, along with the Fırtına Dere and Hala Dere-1 bridges. With this opening, 10 kilometers of the total project have been completed. The tunnel and associated bridges are expected to reduce travel time to the plateau by 20 minutes, bringing the total travel time down from approximately 55 minutes to 35 minutes.
The development aims to generate an annual saving of 772 million lira in time and fuel, while reducing annual carbon emissions by 4,800 tons. Specifically, the project is expected to provide 97 million lira in fuel cost savings.
Construction continues on the remaining sections, including the Hala and Hala-2 tunnels. A 7-kilometer stretch between Çamlıhemşin and Ayder is targeted for completion by the end of this year. The overall project features three tunnels totaling 3,670 meters and five bridges. Minister Uraloğlu noted that these investments are part of a broader national effort to modernize Turkey’s transportation network.
Entities
Çamlıhemşin Tüneli · Rize · Abdulkadir Uraloğlu · Ministry of Transport and Infrastructure · Ayder Yaylası
Claims
What the coverage asserts, and how well corroborated each claim is across sources.
- [● 3 SOURCES] The project will reduce travel time by 20 minutes. www.gazetebirlik.com · www.medyagazete.com · www.aksiyon.com.tr
- [● 2 SOURCES] The Çamlıhemşin Tunnel and Ayder road project is expected to save 772 million lira annually. www.gazetebirlik.com · www.medyagazete.com
- [● 2 SOURCES] The opened section includes the 955-meter Çamlıhemşin Tunnel and the Fırtına Deresi and Hala Deresi-1 bridges. www.gazetebirlik.com · www.aksiyon.com.tr
- [○ 1 SOURCE] The investment is projected to reduce carbon emissions by 4,800 tons. www.gazetebirlik.com
- [○ 1 SOURCE] The total project length is planned to be 36.5 km. www.aksiyon.com.tr
- [○ 1 SOURCE] A 7-kilometer section between Çamlıhemşin and Ayder is targeted for completion by the end of the year. www.aksiyon.com.tr
Timeline
-
1 day ago
[BUSINESS] 21 sourcesTurkey advances major metro and logistics infrastructure projectsTurkey's Ministry of Transport is advancing major projects, including the Ümraniye-Kavacık-Beykoz metro in Istanbul and the Çamlıhemşin Tunnel and İyidere Logistics Port in Rize.
-
3 days ago
[BUSINESS] 17 sourcesÇamlıhemşin Tunnel to open August 17 in RizeTurkey will open the Çamlıhemşin Tunnel and associated bridges on August 17, reducing travel time to Ayder Plateau to 35 minutes and saving an estimated 772 million lira annually.
-
5 days ago
[INTERNATIONAL] 19 sourcesAyder Plateau road project opens new tunnel and bridge sectionA new 2-kilometer section of the Çamlıhemşin-Ayder road, including the Çamlıhemşin Tunnel, will open this Monday, reducing travel time to Ayder Plateau by 20 minutes.
Sources
61saat.com · aksam.com.tr · aksiyon.com.tr · apjii.or.id · avrupagazete.co.uk · aydinses.com · benguturk.com · boldmedya.com · bursahakimiyet.com.tr · dikgazete.com · dunya.com · gazetedamga.com.tr · gazeteilksayfa.com · gazetepencere.com · gazeterize.com · guvengazetesi.com.tr · gzt.com · haber16.com · haber3.com · haberankara.com · haberlermersin.com · haberport.com · halktv.com.tr · internethaber.com · karar.com · kks.ch · m.sabah.com.tr · medyafaresi.com · medyagazete.com · mersinhaber.com · meydannet.com · na.no · ogunhaber.com · poolfool.com · rapportrummet.se · rizedeyiz.com · ropeahead.com · saintsinner.com · sanayigazetesi.com.tr · shewired.com · skiingadventure.com · snowsonline.fr · takagazete.com.tr · tgrthaber.com · turkgun.com · yenicaggazetesi.com.tr · yenisafak.com
This summary has been updated 4 times: see revision history