Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [QUIET] · [BUSINESS]
2 clusters · 8 sources · 3 days · First seen · Last updated
Barcelona-El Prat Airport control tower power failure
Overview
An electrical failure in the control tower at Josep Tarradellas Barcelona-El Prat Airport caused a suspension of takeoffs and landings. Initial reports indicated that the outage forced air traffic controllers to regulate traffic, leading to significant delays and aircraft waiting on the ground. Aena reported that power was restored approximately one hour after the failure was identified, though operations were restored progressively with increased spacing between landing aircraft.
Subsequent details revealed that the outage affected radar screens, flight plan displays, voice communication systems, and meteorological information. While Aena reported the incident lasted about 15 minutes, air traffic controllers stated the disruption lasted approximately one and a half hours, during which they managed flights manually using “pencil and paper.”
The incident resulted in 10 diverted flights, 24 cancellations, and 224 delayed flights, with Ryanair reporting approximately 6,000 affected passengers. The Unión Sindical de Controladores Aéreos (USCA) has demanded a formal investigation, calling the loss of power at a major European airport “unacceptable,” while Enaire maintained that safety protocols were upheld.
Entities
Aena · Unión Sindical de Controladores Aéreos · Ryanair · Eurocontrol · ENAIRE
Timeline
-
28 days ago
[BUSINESS] 3 sourcesBarcelona-El Prat Airport suffers major disruption after control tower power outageA power outage at Barcelona-El Prat Airport's control tower caused 10 flight diversions, 224 delays, and affected thousands of passengers, prompting calls for an investigation by air traffic controllers.
-
about 1 month ago
[BUSINESS] 5 sourcesEl Prat Airport operations disrupted by control tower power failureAn electrical failure in the control tower at Barcelona's El Prat airport temporarily halted flights, causing significant delays. Power has been restored, and operations are recovering progressively.
Sources
capital.es · enmemoria.lavanguardia.com · haberlerimiz.com · hosteltur.com · marcelrizzo.blogosfera.uol.com.br · moncloa.com · preferente.com · teatrnawoli.pl