API
< Back to situation

[REVISION HISTORY]

Iberian electric vehicle infrastructure expansion

10 recorded revisions of this situation.

What changed

2026-10-21 09:42 UTC → 2026-11-06 23:56 UTC · added removed

While Iberian nations continue expanding electric vehicle (EV) charging infrastructures, Spain faces challenges with deployment rates and network reliability. As of September 1, 2026, AEDIVE reported 52,746 operational points in Spain, a 5.49% increase from the end of 2025. This figure reflects a recent downward adjustment from July’s recorded 57,000 points, which AEDIVE attributed to the removal of inactive or outdated equipment that failed to meet new interoperability and payment standards. Despite these adjustments, there is equipment. Recent data indicates a notable shift toward high-power infrastructure. Ultra-fast charging points exceeding 350 kW grew by 10.38%, significant slowdown in Spanish deployment. Anfac reported that while those 5,003 points were installed between 150 and 350 kW increased by 22.50%. In Portugal, expansion continues through both private January and public initiatives, including a social-impact network September 2026, this volume is only 37.4% of over 90 points launched by Leroy Merlin and Helexia, the amount recorded during the same period in 2025. Furthermore, approximately 17,965 points, or 23.6% of the total network, are currently non-operational due to malfunctions, poor maintenance, or connection delays. Spain’s infrastructure index of 15.9 remains roughly half the European Union average of 31.5. Despite these hurdles, adoption and a new 2,000 kW high-power facility at infrastructure are growing. In the Penafiel Transport Center to support Valencian Community, 100% electric bus fleets. To address gaps vehicle sales rose by 22.8% in highway coverage, 2026, partly driven by rising fuel prices. Strategic high-power projects continue, such as the Spanish government has prioritized ultra-fast charging corridors. Following a tender Iberdrola bp pulse hub in San Cibrao das Viñas, which offers 600 kW output for a station near Saelices on heavy transport. On the A-3 highway, the Moya Hub Honrubia has become is now operational at kilometer 168. This hub serves as a strategic point between Madrid and 168, providing 2,320 kW of capacity. Additionally, the Levantine coast, featuring 22 ultra-fast DC stations with government has authorized a total capacity of 2,320 kW, including dedicated spots tender for electric trucks. a new ultra-fast station near Saelices, Cuenca, as part of a 611.9 million euro state concession plan to decarbonize the national highway network.

Versions

  1. 2026-11-06 23:56 UTC Iberian electric vehicle infrastructure expansion
  2. 2026-10-21 09:42 UTC Iberian electric vehicle infrastructure expansion
  3. 2026-10-14 04:35 UTC Iberian electric vehicle infrastructure expansion
  4. 2026-10-13 04:17 UTC Iberian electric vehicle infrastructure expansion
  5. 2026-10-08 11:53 UTC Iberian electric vehicle infrastructure expansion
  6. 2026-10-06 20:02 UTC Iberian electric vehicle infrastructure expansion
  7. 2026-10-05 18:01 UTC Iberian electric vehicle infrastructure expansion
  8. 2026-09-27 19:21 UTC Iberian electric vehicle infrastructure expansion
  9. 2026-09-23 12:35 UTC Iberian electric vehicle infrastructure expansion
  10. 2026-09-21 05:55 UTC Iberian electric vehicle infrastructure expansion
  11. 2026-09-17 12:21 UTC Iberian electric vehicle infrastructure expansion

Select a version to see what changed compared to the one before it.