Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [QUIET] · [BUSINESS]
2 clusters · 10 sources · 29 days · First seen · Last updated
Lisbon infrastructure maintenance and traffic restrictions
Overview
Traffic in the Lisbon district will face restrictions at the Túnel do Grilo, part of the IC-17 CRIL, for a 60-day period starting on a Monday. Infraestruturas de Portugal (IP) announced that the maintenance involves upgrading the lighting system within the galleries and near the tunnel entrances.
During the works, traffic will be limited to two lanes per gallery with a reduced speed limit of 50 km/h. Between 22:00 and 06:00, lanes will be closed, leaving traffic to flow through either two lanes or, in exceptional cases, a single lane.
Entities
Lisbon · Almada · Lusoponte · Infraestruturas de Portugal · Ponte 25 de Abril
Timeline
-
[POLITICS] 7 sourcesTúnel do Grilo traffic restrictions in Lisbon due to maintenance
Traffic in Lisbon's Túnel do Grilo will be restricted for 60 days starting Monday for lighting system maintenance.
-
[BUSINESS] 5 sourcesPonte 25 de Abril to face night-time traffic restrictions
Traffic on Portugal's 25 de Abril Bridge will be restricted at night from September 21 to 25 for routine repaving works.
Sources
asbeiras.pt · cmjornal.xl.pt · correiodamanha.pt · correiodamanhacanada.com · diariodistrito.sapo.pt · eco.sapo.pt · negocios.pt · observador.pt · rr.pt · sapo.pt