[REVISION HISTORY]
National Highway 28B subsidence in Lâm Đồng
1 recorded revision of this situation.
What changed
2026-10-30 04:35 UTC → 2026-11-04 03:22 UTC ·
added
removed
Severe land subsidence and erosion have impacted National Highway 28B in Lâm Đồng Province, specifically near the Đại Ninh Pass and Phan Sơn Commune. Initial reports indicated that heavy rainfall caused the road surface to sink and crack over a 50 meter stretch, while fissures appeared on adjacent slopes, increasing landslide risks. By late October, the situation escalated in the Phúc Thọ commune area of Lâm Hà district. Continuous heavy rainfall since early September caused the road surface to sink approximately 35 cm, with cracks reaching up to 70 meters in length and 20 cm in depth. Due to the high risk of road fractures and landslides, authorities implemented a total traffic ban on the section between Km136+800 and Km136+900. The damage has also extended toward the edge of the Đồng Nai 3 hydroelectric reservoir. Local departments are currently working On October 30, field inspections revealed that cracks were expanding at a rate of 0.5 to develop structural repair solutions. 10 cm per day. By early November, the Lam Dong Provincial People's Committee declared a natural disaster emergency for the affected stretch. Despite previous attempts to stabilize the area using aggregate and concrete, the ground remains unstable, with sinkholes appearing on the shoulders and damage extending over a 100 meter area. Authorities have implemented traffic diversion measures, installed warning signs, and deployed personnel to regulate vehicles while the Department of Construction prepares emergency repairs.
Versions
- 2026-11-04 03:22 UTC National Highway 28B subsidence in Lâm Đồng
- 2026-10-30 04:35 UTC National Highway 28B subsidence in Lâm Đồng
Select a version to see what changed compared to the one before it.