[REVISION HISTORY]
Naucalpan infrastructure and public safety updates
Updated 4 times since CLSTR started tracking revisions of this situation.
What changed
2026-10-17 04:52 UTC → 2026-10-21 04:56 UTC ·
added
removed
The municipal government of Naucalpan, led by Mayor Isaac Montoya Márquez, continues to advance its infrastructure and public safety initiatives. The administration is working toward a goal of rehabilitating one million square meters of roads across 146 neighborhoods, with over 500,000 square meters already completed through the efforts of the Public Works department, Public Services, and the Municipal Water Organism (OAPAS). These works include replacing obsolete hydraulic networks to prevent sinkholes and leaks, as well as repaving nearly 10 kilometers of the Periférico Norte lateral lanes. A key component of this progress is the COMUNA (Comunidad Unida y Activa) program, a collaborative model where the government provides materials and technical guidance while organized neighbors assist in execution to optimize resources. Through COMUNA, the municipality has completed over 100 urban rehabilitations. In 2025, the program executed 52 street rehabilitations covering approximately 22,686 square meters in areas such as Rincón Verde, Izcalli Chamapa, and San Lorenzo Totolinga. Notably, the administration reported a 319 percent increase in public investment for municipal reconstruction during its first year, the highest growth in this category nationwide. The administration has set a goal to reach 200 intervention points through this program. Public safety metrics also show improvement. Data from the Oficina Coordinadora de Riesgos Asegurados (OCRA) indicates improvement, with insured vehicle theft decreased decreasing by 63.3 percent between 2024 and 2026, while and high-impact crimes fell falling by 35.8 percent between 2024 and 2025. Additionally, INEGI reported that citizen perception of insecurity dropped from 80.8 to 71 percent. To maintain sustain these trends, the municipality has expanded its patrol fleet from 120 to inaugurated a 3.2-kilometer ‘Safe and Bright Path’ on 16 de Septiembre Avenue, featuring over 400 vehicles 300 luminaries. Additionally, a new Command and is increasing its Control Center (C2) has been established in a previously abandoned facility to benefit approximately 1,355 residents. To further bolster security, Mayor Montoya Márquez announced an investment exceeding 500 million pesos to strengthen the video surveillance network from 65 to a target of 1,200 cameras. system and the C4 center.
Versions
- 2026-10-21 04:56 UTC Naucalpan infrastructure and public safety updates
- 2026-10-17 04:52 UTC Naucalpan infrastructure and public safety updates
- 2026-09-30 02:49 UTC Naucalpan infrastructure and public safety updates
- 2026-09-27 23:50 UTC Naucalpan municipal infrastructure and safety updates
- 2026-09-24 02:51 UTC Naucalpan municipal infrastructure rehabilitation
Only revisions since CLSTR began indexing content versions appear here. Select a version to see what changed compared to the one before it.