Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [ACTIVE] · [TECHNOLOGY]
4 clusters · 8 sources · 33 days · First seen · Last updated
PLD Space Miura 5 development and commercial expansion
Overview
PLD Space has initiated system level testing and subsystem validation for its Miura 5 orbital launcher. The company has manufactured three vehicles, including two qualification units and one primary flight vehicle, to support its vertical integration model. The second stage, which integrates structures, avionics, propulsion, and control systems, is undergoing qualification testing in Teruel, with a demonstration flight anticipated in the first half of 2027. Following these technical developments, the company has secured international contracts for defense satellite launches. President Ezequiel Sánchez stated that while the company did not initially target the arms sector, rising global military spending and interest in dual use technologies have boosted business. These international defense contracts reflect a broader European interest in developing competitive alternatives to American technology. Sánchez noted that while Spanish defense spending is projected to increase by approximately 33 billion euros, current defense-related launch contracts have been secured internationally rather than through the Spanish Ministry of Defense. In a significant commercial milestone, PLD Space signed its first commercial launch contract with Mitsubishi Electric. The agreement involves launching a small technological demonstrator satellite aboard the Miura 5 rocket for In-Orbit Demonstration (IOD). This mission aims to support Mitsubishi Electric in developing a future high-reliability megaconstellation for telecommunications, Earth observation, geolocation, and navigation. The launch is planned for the second test flight of the Miura 5, targeting Low Earth Orbit (LEO) during the second half of 2027, contingent upon the results of the initial flight. Mitsubishi Electric has previously served as a major strategic investor in PLD Space, contributing to funding rounds totaling 288 million euros. To support the development of the Miura 5 and Miura 9 rockets, PLD Space plans to double its workforce at the Teruel airport in Aragon by 2029, increasing permanent staff from 23 to 46.
Entities
PLD Space · Ezequiel Sánchez · European Space Agency · Teruel Airport · Teruel
Timeline
-
[TECHNOLOGY] 3 sourcesPLD Space to double workforce in Teruel for rocket testing
PLD Space plans to double its staff in Teruel by 2029, leveraging ESA funding to expand rocket testing capabilities for its Miura 5 and Miura 9 launchers.
-
[TECHNOLOGY] 4 sourcesPLD Space signs first commercial launch contract with Mitsubishi Electric
PLD Space has secured its first commercial contract with Mitsubishi Electric to launch a technology demonstrator satellite via its Miura 5 rocket, supporting future satellite megaconstellations.
-
[BUSINESS] 2 sourcesPLD Space secures international defense satellite launch contracts
PLD Space president Ezequiel Sánchez announced that the company has secured international contracts for defense satellite launches, driven by rising global military spending and demand for dual-use technology.
-
[TECHNOLOGY] 3 sourcesPLD Space begins system-level testing for Miura 5 orbital launcher
PLD Space has manufactured three Miura 5 vehicles and begun system-level testing of the orbital launcher's second stage in Teruel, aiming for a first demonstration flight in early 2027.
Sources
aeromorning.com · astrospace.it · columnadigital.com · diariodeibiza.es · lacronicabadajoz.com · lacronicadebadajoz.elperiodicoextremadura.com · laopinioncoruna.es · microsiervos.com
This summary has been updated 2 times: see revision history