[REVISION HISTORY]
PLD Space Miura 5 development and commercial expansion
2 recorded revisions of this situation.
What changed
2026-11-18 13:52 UTC → 2026-11-21 05:30 UTC ·
added
removed
PLD Space has initiated system level testing and subsystem validation for its Miura 5 orbital launcher. The company has manufactured three vehicles, including two qualification units and one primary flight vehicle, to support its vertical integration model. The second stage, which integrates structures, avionics, propulsion, and control systems, is undergoing qualification testing in Teruel, with a demonstration flight anticipated in the first half of 2027. Following these technical developments, the company has secured international contracts for defense satellite launches. President Ezequiel Sánchez stated that while the company did not initially target the arms sector, rising global military spending and interest in dual use technologies have boosted business. These international defense contracts reflect a broader European interest in developing competitive alternatives to American technology. Sánchez noted that while Spanish defense spending is projected to increase by approximately 33 billion euros, current defense-related launch contracts have been secured internationally rather than through the Spanish Ministry of Defense. In a significant commercial milestone, PLD Space signed its first commercial launch contract with Mitsubishi Electric. The agreement involves launching a small technological demonstrator satellite aboard the Miura 5 rocket for In-Orbit Demonstration (IOD). This mission aims to support Mitsubishi Electric in developing a future high-reliability megaconstellation for telecommunications, Earth observation, geolocation, and navigation. The launch is planned for the second test flight of the Miura 5, targeting Low Earth Orbit (LEO) during the second half of 2027, contingent upon the results of the initial flight. Mitsubishi Electric has previously served as a major strategic investor in PLD Space. Space, contributing to funding rounds totaling 288 million euros. To support the development of the Miura 5 and Miura 9 rockets, PLD Space plans to double its workforce at the Teruel airport in Aragon by 2029, increasing permanent staff from 23 to 46.
Versions
- 2026-11-21 05:30 UTC PLD Space Miura 5 development and commercial expansion
- 2026-11-18 13:52 UTC PLD Space Miura 5 development and commercial expansion
- 2026-11-05 21:51 UTC PLD Space Miura 5 development and commercial expansion
Select a version to see what changed compared to the one before it.