< Back to situation

[REVISION HISTORY]

Regional road infrastructure rehabilitation projects

Updated 1 time since CLSTR started tracking revisions of this situation.

What changed

2026-08-15 18:03 UTC → 2026-08-28 00:21 UTC · added removed

Infrastructure development and road rehabilitation efforts are underway across several regions to improve connectivity and resilience. In Zimbabwe, rehabilitation of the 440km Bulawayo-Victoria Falls Road has resumed full-scale operations through eight contractors under a public-private partnership. Following Senate concerns regarding construction slowdowns, Transport and Infrastructural Development Minister Felix Mhona confirmed that contractors, each responsible for approximately 51km, are expected to accelerate work on this segment of the Beitbridge-Bulawayo-Victoria Falls corridor. In Malawi, the rehabilitation of the Magomero turn-off to Namadzi River Road has been completed as part under Phase Two of the Regional Climate Resilience Programme, intended to support local Programme. Minister of Local Government Ben Phiri stated the improved route will boost economic activity for farmers near the Mbulumbudzi Market and ensure road passability during extreme weather. facilitate access to the historic grave site of Dr. David Livingstone. In Madagascar, work has resumed on National Road 4 (RN4) between Berivotra and the Boanamary junction following previous suspensions caused by material shortages junction. To comply with World Bank contract requirements prohibiting limestone, technicians are sourcing granite from the Betsiboka region and technical constraints regarding basaltic stones from Marovoay, with major works expected to conclude by late November. Additionally, the use of limestone. Meanwhile, 43.9km ‘cocoa road’ in the Ambanja district has reached the provisional reception stage. Funded by the World Bank, this project aims to reduce transport costs for cocoa and vanilla. In Haiti, the Ministry of Public Works, Transport and Communications is performing maintenance, drainage, and reshaping operations on various routes, including National Road 2 (RN2), though (RN2) in Petit-Goâve and the Boutilliers road. However, significant degradation remains on other major roads such as National Road 1 (RN1). (RN1) and within the Port-au-Prince metropolitan area.

Versions

  1. 2026-08-28 00:21 UTC Regional road infrastructure rehabilitation projects
  2. 2026-08-15 18:03 UTC Regional road infrastructure rehabilitation projects

Only revisions since CLSTR began indexing content versions appear here. Select a version to see what changed compared to the one before it.