Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [ACTIVE] · [BUSINESS]
2 clusters · 4 sources · 18 days · First seen · Last updated
Cairo Metro Line 4 construction
Overview
Egypt is advancing the construction of the Cairo Metro Line 4, a 19 km strategic infrastructure project designed to expand the nation’s sustainable mass transit network. The first phase includes 17 stations, with 16 located underground and one at the surface, connecting key areas such as the Grand Egyptian Museum, Giza, and Al Fustat.
Initial reports highlighted the simultaneous use of six tunnel boring machines to construct the tunnels. The project involves a consortium of national Egyptian companies for construction and electromechanical works, with a Mitsubishi/Orascom alliance managing systems and track work.
Following construction progress, Prime Minister Mostafa Madbouly inspected the project, including a large-scale heavy overhaul workshop designed for train maintenance and storage. As of mid-September, five trains have arrived for testing, while additional units are undergoing factory testing, assembly, or manufacturing.
Entities
Ministry of Transport · Orascom Construction · Mostafa Madbouly · Cairo · Kamel El-Wazir
Timeline
-
2 days ago
[BUSINESS] 3 sourcesEgypt Prime Minister inspects Cairo Metro Line 4 projectEgyptian Prime Minister Mostafa Madbouly inspected the first phase of Cairo Metro Line 4, a 19 km project connecting Cairo and Giza to enhance sustainable mass transit and urban development.
-
20 days ago
[BUSINESS] 2 sourcesEgypt advances Cairo Metro Line 4 constructionEgypt is advancing the first phase of Cairo Metro Line 4, utilizing six tunnel boring machines simultaneously to build a 19 km route featuring 17 stations and 23 new Mitsubishi train units.
Sources
alahalygate.com · elaosboa.com · elbalad.news · elzmannews.com