Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [QUIET] · [BUSINESS]
3 clusters · 14 sources · 4 days · First seen · Last updated
Catalan Eix Transversal railway development
Overview
The Generalitat de Catalunya has officially launched a tender for the first phase of the ‘Eix Transversal Ferroviari’ study. Managed by the public company Ifercat, this phase focuses on the stretch between Lleida, Igualada, and Martorell, with an estimated cost of 1.5 million euros and a duration of over two years.
The proposed network, expected to exceed 250 km, features a double branch: one running from Lleida to Igualada, then splitting toward Martorell, a station in the Vallès region, and Barcelona-Sagrera, and another running from Igualada through Manresa and Vic to Girona. While the Ministry of Transport views the axis as a high-speed line, the regional government intends for it to also accommodate freight trains to reduce dependence on the Mediterranean Corridor.
As part of the development, studies propose a new intermodal passenger station in the Vallès region to facilitate transfers between Renfe’s Rodalies R8 line, FGC services, and high-speed AVE trains. Rubí and Sant Cugat, specifically near Volpelleres and Hospital General, have been identified as feasible locations. The plan aims to ensure high-speed trains stop at least once in every county the line traverses. The broader study is expected to last approximately 28 months, with construction not anticipated before 2030.
Entities
Generalitat de Catalunya · Ifercat · Barcelona · Sant Cugat · Girona
Timeline
-
22 days ago
[BUSINESS] 3 sourcesCatalonia plans new high-speed rail station in VallèsCatalonia has tendered a study for the Eix Transversal Ferroviari, a rail project to connect Lleida and Girona via a new high-speed branch including a station in the Vallès region.
-
25 days ago
[BUSINESS] 3 sourcesVallès region considered for new high-speed rail stationThe Generalitat de Catalunya is studying a new high-speed rail intermodal station in Vallès, with Rubí and Sant Cugat identified as primary candidate locations.
-
25 days ago
[BUSINESS] 8 sourcesCatalan government tenders study for Eix Transversal railwayThe Catalan government has commissioned a study for the Eix Transversal Ferroviari to connect Lleida and Girona, bypassing Barcelona via a new high-speed and freight rail network.
Sources
324.cat · catalunyapress.cat · elnacional.cat · ettv.com.tw · gerio.cat · konstfack.se · lamanyana.es · larepublica.cat · merca2.es · outdoor.se · revistadelvalles.es · totcerdanyola.cat · totrubi.cat · totsantcugat.cat
This summary has been updated 1 time: see revision history