< Back to situations

Monitor this situation.

[SITUATION] · [QUIET] · [BUSINESS]

2 clusters · 20 sources · 6 days · First seen · Last updated

Jacuizinho River bridge reconstruction

Overview

The construction of a 120-meter bridge over the Jacuizinho River, intended to connect the municipalities of Arroio do Tigre and Estrela Velha in Rio Grande do Sul, has reached structural completion.

The R$ 6.745 million project aims to restore connectivity in the Vila Itaúba region after the previous bridge was destroyed by floods in 2024. Previous attempts to maintain access via a temporary wooden crossing failed after being destroyed by heavy rains in May 2025.

Work has now entered its final phase, involving the execution of access embankments. An official opening date will be announced following the completion of all services and verification of safety conditions.

Entities

Estrela Velha · Mangabeira · Arroio do Tigre · Cotiporã · Secretaria de Infraestrutura

Timeline

  1. [POLITICS] 2 sources
    Jacuizinho River bridge construction completed in Rio Grande do Sul

    A new 120-meter bridge over the Jacuizinho River is structurally complete, restoring the link between Arroio do Tigre and Estrela Velha after flood damage in 2024.

  2. [BUSINESS] 18 sources
    Rio Cuiá bridge construction begins to connect Mangabeira and Valentina

    Mayor Leo Bezerra has inspected the installation of steel beams for a new R$ 27 million bridge over the Rio Cuiá, connecting Mangabeira and Valentina Figueiredo to improve mobility and prevent flooding.

Sources

correiodealagoas.com.br · ejornais.com.br · folhacentrosul.com.br · jornaldoradialista.com.br · jornalolince.com.br · jornalsemanario.com.br · jornalwebminas.com.br · maracanaonline.com.br · novasdodia.com.br · odiariodebarretos.com.br · oretratodobrasil.com.br · overbo.com.br · penarol.com.br · radioeldoradoam.com.br · radiosobradinho.com.br · revistavigor.com.br · saobentoemfoco.com.br · tvtribunape.com.br · vejadetudo.com.br · zero83.com.br