< Back to situations

Monitor this situation.

[SITUATION] · [QUIET] · [BUSINESS]

2 clusters · 6 sources · 8 days · First seen · Last updated

Valencia regional road infrastructure improvements

Overview

The Generalitat Valenciana is conducting various infrastructure projects in the Valencia region to improve road safety and traffic flow.

In Real, preliminary works have begun on the CV-50 highway to construct a new roundabout at the intersection of Mariano Benlliure and Riu Magre streets. This project, budgeted at 350,000 euros, aims to address a junction prone to accidents by replacing a complex three-branch configuration with a new design featuring a 12-meter exterior radius.

Simultaneously, work is progressing on the CV-800 highway in Mutxamel. This 1.1 million euro project involves the demolition of a bridge that had a low clearance of 4.5 meters, which failed to meet the 5.3-meter standard and caused accidents. A new roundabout is being built in its place to improve connectivity between the municipality and the A-7 highway.

Entities

Generalitat Valenciana · Valencia · Dirección General de Tráfico · Real · Montroi

Timeline

  1. [BUSINESS] 2 sources
    Mutxamel roadworks: Bridge demolished on CV-800 to improve safety

    Roadworks on the CV-800 in Mutxamel, Spain, include the demolition of a low-clearance bridge and the construction of a new roundabout to improve safety and traffic flow.

  2. [BUSINESS] 4 sources
    Generalitat begins CV-50 roundabout construction in Real

    The Generalitat has begun work on a 350,000 euro roundabout on the CV-50 in Real to improve road safety and traffic flow at a high-risk intersection.

Sources

actualitatvalenciana.com · alicanteplaza.es · diariodeleon.es · diariolibre.com · levante-emv.com · noticiesdigitals.com