Get alerts on this situation
We’ll email you as it develops, and you can follow the whole thread from day one.
Unsubscribe anytime.
[SITUATION] · [QUIET]
3 clusters · 14 sources · 8 days · First seen · Last updated
Category: HEALTH
North Macedonia health infrastructure upgrades
Entities: Clinical Hospital Tetovo · Zlatko Perinski · Ministry of Health of North Macedonia · Clinical Hospital Štip · Clinical Hospital Bitola
Overview
In late July 2026, North Macedonia began a series of health‑sector upgrades. The Idadia Polyclinic in Skopje started a 31‑million‑denar reconstruction focused on energy‑efficiency measures such as thermal insulation, modern heating, LED lighting and upgraded electrical systems, under a programme run by the Ministry of Finance with World Bank and Western Balkans Investment Framework support.
A few days later, the government announced a much larger €183 million commitment to two regional hospitals: €74 million to modernise the Clinical Hospital in Tetovo and €109 million to complete a new Clinical Hospital in Štip. The projects aim to expand diagnostic, treatment and emergency capacities, lessen patient referrals to the capital, and improve working conditions for staff and students. Both initiatives were presented with World Bank involvement, signalling a continuing push to modernise the country's public health facilities.
The €183 million funding was formally approved on 30 July, with Health Minister Sasho Klekovski, Health Insurance Fund director Zlatko Perinski, Štip mayor Ivan Jordanov and a World Bank delegation reviewing technical and financial details. The following day, the Clinical Hospital Bitola launched a 30.4 million‑denar equipment programme, replacing outdated devices and adding advanced orthopaedic, ophthalmic, urological and imaging tools, while also hiring 61 permanent staff to boost regional diagnostic capacity.
The Bitola upgrade includes a new pathology‑department digestor, electric orthopaedic burr, phaco‑cataract surgery system, ophthalmic echo unit, monopolar urology resection set, colonoscope, gastroscope, optical‑coherence‑tomography scanner, DEXA machine, a surgical robot and PACS‑linked software. It also introduces echo‑guided prostate biopsy, the first use of this method at the hospital, and is expected to markedly improve diagnostic and operative services for patients in Bitola and surrounding areas.
Claims
What the coverage asserts, and how well corroborated each claim is across sources.
- [● 6 SOURCES] Over 30.4 million denars are being invested in medical equipment for the Clinical Hospital Bitola between 2024 and 2026. (Bitola articles)
- [● 6 SOURCES] Equipment older than 20 years is being replaced at the hospital. (Bitola articles)
- [● 6 SOURCES] The pathology department's digestor, originally installed about 55 years ago, is being replaced. (Bitola articles)
- [● 6 SOURCES] New devices include an electric burr for orthopaedics, a phaco‑method cataract‑surgery system, and an echo unit for ophthalmology. (Bitola articles)
- [● 6 SOURCES] A new colonoscope and gastroscope have been supplied for the internal medicine department. (Bitola articles)
- [● 6 SOURCES] The hospital has also acquired an optical‑coherence‑tomography scanner, a DEXA machine, a robot and a PACS‑linked software solution. (Bitola articles)
- [● 6 SOURCES] A procedure for echo‑guided prostate biopsy has been started, marking its first use at the hospital. (Bitola articles)
- [● 6 SOURCES] 61 permanent staff members have been hired since July 2024. (Bitola articles)
- [● 2 SOURCES] A €109 million (6.7 billion denar) investment will complete the new Clinical Hospital in Štip. (belongs=true)
- [● 2 SOURCES] The Štip hospital will serve around 150,000 residents directly and about 250,000 people in its wider catch‑area. (belongs=true)
- [● 2 SOURCES] Both hospital projects aim to reduce patient referrals to Skopje and improve medical training conditions. (belongs=true)
- [● 2 SOURCES] Health Minister Sasho Klekovski presented the hospital investment plans. (belongs=true)
Timeline
-
9 days ago
[HEALTH] 6 sourcesBitola Hospital Receives 30.4 million denar Modernisation UpgradeBitola Hospital in North Macedonia is investing 30.4 million denars (2024‑26) in new medical equipment, replacing 20‑year‑old devices, adding advanced imaging and surgical tools, and hiring 61 staff.
-
11 days ago
[HEALTH] 9 sourcesNorth Macedonia invests €183 million in new hospitals at Tetovo and ŠtipNorth Macedonia is spending €74 million on a new Tetovo clinical hospital and €109 million on a modern Štip regional hospital, aiming to improve services for up to 250,000 residents and lessen pressure on Skopj
-
17 days ago
[HEALTH] 3 sourcesSkopje’s Idadia Clinic Begins 31‑Million‑Denar ReconstructionSkopje’s Idadia Polyclinic has started a 31 million‑denar reconstruction to improve energy efficiency, modernize facilities, and lower operating costs for patients and staff.
Sources
biznisinfo.mk · denesen.mk · ernesthuska.blog.sme.sk · expres.mk · nezavisen.mk · opserver.mk · press24.mk · republika.mk · skopje1.mk · tocka.com.mk · tribuna.mk · vecer.mk · zoom.mk · zurnal.mk
This summary has been updated 2 times: see revision history