Monitor this situation.
Unsubscribe anytime.
[SITUATION] · [QUIET] · [BUSINESS]
4 clusters · 15 sources · 44 days · First seen · Last updated
PT PLN infrastructure and service developments
Overview
PT PLN (Persero) is executing various electrical infrastructure and service projects across Indonesia. In Central Java, the company is accelerating the development of electrical infrastructure within the Kendal Special Economic Zone (KEK Kendal). This project includes the construction of a 150 kV Kendal Substation and 150 kV Kendal Incomer High Voltage Overhead Lines, with a target completion date by the end of 2026. The initiative aims to attract investors and increase the number of tenants in the zone. In West Java, PLN has implemented the ‘Electrifying Agriculture’ (EA) program in Bekasi Regency. This initiative replaces fuel-powered pumps with electricity-based irrigation systems for farmers in Cicau Village. The program also provides electric tractors, rice threshing machines, and electric lawn mowers to improve agricultural productivity and farmer income. Expanding into the digital sector, PLN has supplied 2,038 megavolt ampere (MVA) of electricity to 159 data center customers across Indonesia, who have consumed a total of 2,378 gigawatt hours (GWh) of energy. While 99 percent of this capacity is currently concentrated within the Java, Madura, and Bali power systems—with West Java acting as a major cluster—expansion is moving into Sumatra, Kalimantan, and Sulawesi. PLN President Director Darmawan Prasodjo noted that growth in the data center sector, fueled by artificial intelligence and digital transformation, necessitates specific electrical characteristics including “high reliability, power quality, and the use of clean energy.” To support this, industry experts such as John Ammentorp from Arup have advised that energy system planners must use digital modeling to manage the impact of large-scale demand on local grids and integrate renewable sources like solar and hydro power to prevent bottlenecks. In Central Sulawesi, PLN is accelerating infrastructure construction in Morowali through its Sulawesi Development Unit (UIP).
Entities
PT PLN (Persero) · PT ACN · Dini Sulistyawati · Kelompok Tani Berkah Sakabeh · Indonesia
Timeline
-
[BUSINESS] 2 sourcesPLN accelerates 150 kV transmission project in Morowali
PT PLN (Persero) is accelerating the construction of the 150 kV Bungku-ACN transmission line and Bungku Extension substation in Morowali, targeting energization by December 2026.
-
[BUSINESS] 11 sourcesPLN strengthens Indonesia's power infrastructure for data center growth
PLN is expanding Indonesia's electrical infrastructure to support 159 data centers, providing 2,038 MVA of capacity to meet the growing energy demands of the digital and AI sectors.
-
[BUSINESS] 2 sourcesPLN implements Electrifying Agriculture program in Bekasi
PT PLN (Persero) is boosting agricultural productivity in Bekasi, Indonesia, through its Electrifying Agriculture program, replacing fuel pumps with electric irrigation to increase farmer income.
-
[BUSINESS] 3 sourcesPLN develops electrical infrastructure in Kendal Special Economic Zone
PT PLN (Persero) is constructing a 150 kV substation and transmission lines in the Kendal Special Economic Zone, targeting completion by late 2026 to attract industrial investors.
Sources
antaranews.com · beritaharian.sg · cnbcindonesia.com · disway.id · economy.okezone.com · industry.co.id · makassar.terkini.id · matabangsa.com · medcom.id · portalmedia.id · republika.co.id · rri.co.id · ruangenergi.com · sulselsatu.com · world-today-journal.com
This summary has been updated 3 times: see revision history